Landmark Structures |
| Grapevine Water Tower, City of Grapevine, Texas | ![]() | The project scope here was to condition the environment inside of this structure after three floors were poured and elevator installed. We installed four Liebert systems on floor #2 and #3. A Trane split system served the common areas on floors 2 and 3 with the elevator control room on the first floor. |
| Rockwall Water Tower, City of Rockwall, Texas | ![]() | The project scope here was to condition the environment inside of this structure after three floors were poured and elevator installed. We installed one electric/electric split system on floor #2 and mini-split cool only unit for elevator control room floor #1. |